BGCO (CNP) Neerlerit Inaat Airport — Charts, Approach Plates & Operations
11 official charts for Neerlerit Inaat Airport (BGCO / CNP) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.
BGCO Airport Charts & Approach Plates
Official charts for Neerlerit Inaat Airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.
Airport Diagrams 1
- BGCO BGCO ADC PDF
Instrument Approach Procedures (IAP) 6
Additional Charts 4
- BGCO BGCO NDB A PDF
- BGCO BGCO NDB B PDF
- BGCO BGCO VAC PDF
- BGCO BGCO LDC PDF
Airport Operations
Airport operates MON-FRI only with PPR required. Gravel surfaces with strength dependent on weather conditions. Fire fighting requires 3 hour advance notice except for scheduled flights.
Fuel & Services
- Fuel Available
- Yes
- Fuel Types
- JET-A1
- Fuel Hours
- As AD
- Operating Hours
- MON-FRI 1100-1800 (1000-1700)* UTC EXC SAT/SUN/HOL
- Customs
- Available (PPR, to be submitted not later than 1300 within AD HR. Outside AD HR PPR 9 HR)
MAX 260 L/MIN, Limited, by special arrangement
Parking & Handling
- Details
- Apron surface Gravel, strength depending on meteorological conditions
Special Procedures
PPR 3 HR before landing or start for fire fighting for all traffic except scheduled flights
PPL / GA Operations
Closed SUN/HOL except SAR/MEDEVAC. All surfaces are gravel with weather-dependent strength. No hangar space or repair facilities for visiting aircraft. Limited fuel availability by special arrangement only.
Source: AIP data extracted Apr 15, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
1 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
✓ Free AccessAccess Information: Freely accessible online
Frequently Asked Questions
How many charts are available for BGCO (CNP) Neerlerit Inaat Airport?
We list 11 official charts for BGCO, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.
Where can I find instrument approach plates for BGCO?
All instrument approach procedures (IAP) for BGCO (CNP) Neerlerit Inaat Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for BGCO free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.