EGHO Thruxton Aerodrome — Charts, Approach Plates & Operations
2 official charts for Thruxton Aerodrome (EGHO) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.
EGHO Airport Charts & Approach Plates
Official charts for Thruxton Aerodrome published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.
Additional Charts 2
- EGHO EG-AD-2.EGHO.pdf PDF
- EGHO 484182.pdf PDF
Airport Operations
VFR only aerodrome operating 0900-1700 with PPR required. AVGAS 100LL and JET A-1 fuel available during operating hours. ATS services available as per AD hours.
Fuel & Services
- Fuel Available
- Yes
- Fuel Types
- AVGAS 100LL AVTUR JET A-1
- Fuel Hours
- As AD hours
- Operating Hours
- 0900-1700 (0800-1600)
- Customs
- Available (By arrangement)
AVTUR JET A-1 (AL48 additive not included)
Parking & Handling
- GA Parking
- Available
- Details
- Main apron with asphalt surface
PPL / GA Operations
Use of aerodrome subject to PPR (Prior Permission Required). VFR traffic only permitted. Contact tower@thruxton.com or 01264-772352 for arrangements.
Source: AIP data extracted Apr 20, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
1 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
✓ Free Access
Access Information:
Freely accessible online
Access details: Free online
Alternative Resources:
Frequently Asked Questions
How many charts are available for EGHO Thruxton Aerodrome?
We list 2 official charts for EGHO, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.
Where can I find instrument approach plates for EGHO?
All instrument approach procedures (IAP) for EGHO Thruxton Aerodrome are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for EGHO free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.