EGKK (LGW) London Gatwick Airport — Charts, Approach Plates & Operations
59 official charts for London Gatwick Airport (EGKK / LGW) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.
EGKK Airport Charts & Approach Plates
Official charts for London Gatwick Airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.
Additional Charts 59
- EGKK EG-AD-2.EGKK.pdf PDF
- EGKK 461495.pdf PDF
- EGKK 461501.pdf PDF
- EGKK 430920.pdf PDF
- EGKK 461579.pdf PDF
- EGKK 454102.pdf PDF
- EGKK 454106.pdf PDF
- EGKK 479621.pdf PDF
- EGKK 335849.pdf PDF
- EGKK 420938.pdf PDF
- EGKK 434943.pdf PDF
- EGKK 449707.pdf PDF
- EGKK 421444.pdf PDF
- EGKK 479307.pdf PDF
- EGKK 479311.pdf PDF
- EGKK 427195.pdf PDF
- EGKK 421463.pdf PDF
- EGKK 475252.pdf PDF
- EGKK 421275.pdf PDF
- EGKK 421288.pdf PDF
- EGKK 421646.pdf PDF
- EGKK 449713.pdf PDF
- EGKK 421302.pdf PDF
- EGKK 479314.pdf PDF
- EGKK 421312.pdf PDF
- EGKK 479317.pdf PDF
- EGKK 479320.pdf PDF
- EGKK 421327.pdf PDF
- EGKK 421333.pdf PDF
- EGKK 421476.pdf PDF
- EGKK 421336.pdf PDF
- EGKK 421345.pdf PDF
- EGKK 479323.pdf PDF
- EGKK 378126.pdf PDF
- EGKK 378129.pdf PDF
- EGKK 378132.pdf PDF
- EGKK 378139.pdf PDF
- EGKK 378146.pdf PDF
- EGKK 483106.pdf PDF
- EGKK 378154.pdf PDF
- EGKK 475259.pdf PDF
- EGKK 378162.pdf PDF
- EGKK 378165.pdf PDF
- EGKK 378168.pdf PDF
- EGKK 378171.pdf PDF
- EGKK 378175.pdf PDF
- EGKK 378179.pdf PDF
- EGKK 378187.pdf PDF
- EGKK 434981.pdf PDF
- EGKK 434984.pdf PDF
- EGKK 424210.pdf PDF
- EGKK 424234.pdf PDF
- EGKK 434993.pdf PDF
- EGKK 434996.pdf PDF
- EGKK 424244.pdf PDF
- EGKK 424247.pdf PDF
- EGKK 434999.pdf PDF
- EGKK 435002.pdf PDF
- EGKK 352933.pdf PDF
Airport Operations
London Gatwick is a major international airport operating H24 with full services including customs, ATS, fueling, and handling. Prior arrangements with handling agents required for all flights. JET A-1 fuel available via hydrant system with limited bowser capacity.
Fuel & Services
- Fuel Available
- Yes
- Fuel Types
- JET A-1
- Fuel Hours
- H24
- Operating Hours
- H24
- Customs
- Available (H24)
Hydrant refuelling. Very limited bowser capacity. De-fuelling facilities subject to arrangement with fuel company.
Parking & Handling
- Details
- Operators are to make prior arrangements with one of the handling agents for ground handling of all flights.
Special Procedures
Airlines must have a confirmed contract in place with an aircraft recovery/salvage contractor for aircraft recovery. Aircraft recovery arrangements must be submitted to Gatwick Airport Limited via airsidecompliance@gatwickairport.com.
PPL / GA Operations
IFR/VFR traffic permitted. Telephone calls to ATC operational areas may be recorded. Operators must make prior arrangements with handling agents. Aircraft recovery contracts must be in place and submitted to airport.
Source: AIP data extracted Apr 5, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
6 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
✓ Free Access
Access Information:
Freely accessible online
Access details: Free online
Alternative Resources:
Frequently Asked Questions
How many charts are available for EGKK (LGW) London Gatwick Airport?
We list 59 official charts for EGKK, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.
Where can I find instrument approach plates for EGKK?
All instrument approach procedures (IAP) for EGKK (LGW) London Gatwick Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for EGKK free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.