EKVJ (STA) Stauning Vestjylland Airport — Charts, Approach Plates & Operations
12 official charts for Stauning Vestjylland Airport (EKVJ / STA) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.
EKVJ Airport Charts & Approach Plates
Official charts for Stauning Vestjylland Airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.
Airport Diagrams 1
- EKVJ EKVJ ADC PDF
Instrument Approach Procedures (IAP) 6
Approach/Departure 1
- EKVJ EKVJ APDC PDF
Additional Charts 4
Airport Operations
Stauning Airport operates H24 with single runway 09/27 (1199M available). PPR required 3 hours prior for operations outside office hours (MON-FRI 0700-1530). Both AVGAS 100LL and Jet A1 available with customs/immigration services.
Fuel & Services
- Fuel Available
- Yes
- Fuel Types
- AVGAS 100LL JET-A1
- Fuel Hours
- MON-FRI 0700-1530 (0600-1430), SAT/SUN/HOL 0900-1500 (0800-1400)
- Operating Hours
- H24
- Customs
- Available (H24 (H24), customs clearance and immigration as for AD, PN 1 HR)
100LL: 80 L/MIN, Jet A1: 220 L/MIN for visiting aircraft
Parking & Handling
- GA Parking
- Available
- Details
- Apron surface Asphalt, PCN 21/F/A/Y/T, elevation 16 FT
Special Procedures
PPR 3 HR PN for AD/ADO/AFIS outside stated HR which has to be submitted not later than 3 HR before closing time to ADO
PPL / GA Operations
ATS Reporting Office operates MON-FRI 0700-1530, closed weekends/holidays. Self-service outside stated hours. VHF radio system available to activate runway lighting outside service hours. Wind turbine obstacles north of airport marked and lit.
Source: AIP data extracted Apr 6, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
1 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
✓ Free AccessAccess Information: Freely accessible online
Alternative Resources:
Frequently Asked Questions
How many charts are available for EKVJ (STA) Stauning Vestjylland Airport?
We list 12 official charts for EKVJ, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.
Where can I find instrument approach plates for EKVJ?
All instrument approach procedures (IAP) for EKVJ (STA) Stauning Vestjylland Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for EKVJ free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.