ZUGY (KWE) Guiyang Longdongbao International Airport — Charts, Approach Plates & Operations
Airport charts, approach plates, and operational data for Guiyang Longdongbao International Airport (ZUGY) directly from the official Aeronautical Information Publication.
Airport Operations
ZUGY is open to the public at 3737 feet MSL with two concrete runways (01L/19R and 01R/19L). Full ATC services available including approach control on multiple frequencies, tower, ground, and ATIS. Runway 01R/19L has a 656-foot displaced threshold on 01R and 984-foot displaced threshold on 01L.
Fuel & Services
Parking & Handling
PPL / GA Operations
Airport is open to the public with comprehensive radio services. Note displaced thresholds on both runways. Multiple approach control and tower frequencies available.
Source: AIP data extracted Apr 9, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
4 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
⛔ RestrictedOfficial AIP for China
Access Information:
Restricted access or contact required
Alternative URL: https://www.aischina.com/; Access details: Restricted, registration may be required
Frequently Asked Questions
How many charts are available for ZUGY (KWE) Guiyang Longdongbao International Airport?
Official charts for ZUGY are published in the national Aeronautical Information Publication (AIP). Chart data for this airport is being added to our database.
Where can I find instrument approach plates for ZUGY?
All instrument approach procedures (IAP) for ZUGY (KWE) Guiyang Longdongbao International Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for ZUGY free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.