Bastia Poretta airport

LFKB / BIA

Bastia, FR

LFKB (BIA) Bastia Poretta airport — Charts, Approach Plates & Operations

39 official charts for Bastia Poretta airport (LFKB / BIA) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.

LFKB Airport Charts & Approach Plates

Official charts for Bastia Poretta airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.

Airport Diagrams 1

Approach/Departure 1

Obstacle Charts 1

All charts sourced from official AIP publication. Last updated: April 8, 2026. Always verify with the official AIP before flight.

Airport Operations

Bastia Poretta operates H24 with mandatory PPR (48HR notice) for GA flights via ppr@satab.aero. Fuel available 0600-1800 with after-hours JET A1 on request before 1500. Mandatory handling by SATAB for all GA operations.

Fuel & Services

Fuel Available
Yes
Fuel Types
AVGAS 100LL JET-A1
Fuel Hours
0600-1800
Operating Hours
H24
Customs
Available (Police H24. Customs: from 01/04 to 30/09 H24, from 01/10 to 31/03 HJ (HN O/R before 17 H))

Other times O/R before 1500 for JET A1. Payment methods: CB, VISA, Mastercard, Amex, Eurochecks, Checks, Euros, BP Card, UVAIR Card, World Fuel Service Card

Parking & Handling

GA Parking
Available
Details
Handling mandatory for all general aviation and business aviation aircraft. Shuttle service between parking stands and terminal provided by SATAB
PPR Required

Special Procedures

Mandatory PPR with PN 48HR for all general aviation and business flights by e-mail: ppr@satab.aero. Handling is mandatory for all aircraft in general aviation and business aviation

PPL / GA Operations

PPR mandatory 48 hours in advance for all GA flights. Handling assistance is compulsory for all GA aircraft. No hangar space available for visiting aircraft. 100LL available via unmonitored self-service EUROBOX system.

Source: AIP data extracted Apr 8, 2026. Always verify with official AIP before flight. View source

Radio Frequencies

6 frequencies
Tower
118.000
MHz
BASTIA TWR
Ground
121.825
MHz
GND
Approach
123.825
MHz
BASTIA RADAR APP
ATIS
125.925
MHz
BASTIA ATIS
ARR
37.850
MHz
BASTIA APP
AFIS
124.725
MHz
BASTIA INFO
Emergency Frequency
121.500
International Emergency

Usage Instructions:

Tower: Airport traffic control
Ground: Surface movement control
Approach: Terminal area control
ATIS: Automated weather & airport info
• Click any frequency to copy to clipboard
• Always verify frequencies with current charts before flight
• Frequencies may change - check NOTAMs for updates
Data Source: Frequencies are sourced from OurAirports.com, updated daily. Always verify current frequencies using official airport charts, AIP publications, or contact the airport directly. Frequencies may change due to operational requirements or regulatory updates.

Aeronautical Information Publication (AIP)

Free Access
AIP - France

Official AIP for France via SIA/DGAC (Free)

Managed by: SIA/DGAC

Access Information: Freely accessible online
Access details: Free online

Alternative Resources:

Frequently Asked Questions

How many charts are available for LFKB (BIA) Bastia Poretta airport?

We list 39 official charts for LFKB, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.

Where can I find instrument approach plates for LFKB?

All instrument approach procedures (IAP) for LFKB (BIA) Bastia Poretta airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.

Are the charts for LFKB free?

Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.

How often are charts updated?

Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.