Calvi Sainte Catherine Airport

LFKC / CLY

Calvi, FR

LFKC (CLY) Calvi Sainte Catherine Airport — Charts, Approach Plates & Operations

23 official charts for Calvi Sainte Catherine Airport (LFKC / CLY) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.

LFKC Airport Charts & Approach Plates

Official charts for Calvi Sainte Catherine Airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.

Airport Diagrams 1

Approach/Departure 1

Obstacle Charts 1

All charts sourced from official AIP publication. Last updated: April 8, 2026. Always verify with the official AIP before flight.

Airport Operations

Calvi Sainte Catherine Airport operates seasonally adjusted hours with mandatory PPR for GA flights. Ground handling is required for all GA operations year-round. Customs and immigration services available with seasonal schedules.

Fuel & Services

Fuel Available
Yes
Fuel Types
AVGAS 100LL JET-A1
Fuel Hours
SUM: 0600-1000, 1200-1600, WIN: 0800-1100, 1400-1700
Operating Hours
SUM: 0445-SS+30, WIN: 0545-SS+30
Customs
Available (CUSTOMS: HJ from 01/05 to 30/09, HJ PN 6HR from 01/10 to 30/04. IMMIGRATION: WIN: 0600-1700, SUM: 0500-1600)

Outside these SKED: PN 1HR except for scheduled commercial flights. Payment means: CB, Visa, Eurocard, Mastercard, Amex, Eurocheques in euros, cheques, Euros (cash), BP card, UVAIR World Fuel Service card. TEL: 04 95 65 05 45 / 06 11 69 20 54

Parking & Handling

PPR Required

Special Procedures

Mandatory PPR PN 72 HR (PN 24 HR SUM IATA season) for general aviation flights by e-mail: agcly.casavia@casavia.fr or TEL: 04 95 65 88 40. Ground handling is mandatory all year round for general aviation and commercial flights.

PPL / GA Operations

PPR mandatory 72 hours in advance (24 hours during IATA summer season) for general aviation. Contact agcly.casavia@casavia.fr or 04 95 65 88 40. Ground handling through CASAVIA is mandatory for all GA flights. Fuel available with advance notice outside normal hours.

Source: AIP data extracted Apr 8, 2026. Always verify with official AIP before flight. View source

Radio Frequencies

3 frequencies
Tower
120.800
MHz
CALVI TWR
Ground
121.700
MHz
CALVI GND
ATIS
131.175
MHz
CALVI ATIS
Emergency Frequency
121.500
International Emergency

Usage Instructions:

Tower: Airport traffic control
Ground: Surface movement control
Approach: Terminal area control
ATIS: Automated weather & airport info
• Click any frequency to copy to clipboard
• Always verify frequencies with current charts before flight
• Frequencies may change - check NOTAMs for updates
Data Source: Frequencies are sourced from OurAirports.com, updated daily. Always verify current frequencies using official airport charts, AIP publications, or contact the airport directly. Frequencies may change due to operational requirements or regulatory updates.

Aeronautical Information Publication (AIP)

Free Access
AIP - France

Official AIP for France via SIA/DGAC (Free)

Managed by: SIA/DGAC

Access Information: Freely accessible online
Access details: Free online

Alternative Resources:

Frequently Asked Questions

How many charts are available for LFKC (CLY) Calvi Sainte Catherine Airport?

We list 23 official charts for LFKC, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.

Where can I find instrument approach plates for LFKC?

All instrument approach procedures (IAP) for LFKC (CLY) Calvi Sainte Catherine Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.

Are the charts for LFKC free?

Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.

How often are charts updated?

Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.