ESGJ (JKG) Jönköping Airport — Charts, Approach Plates & Operations
9 official charts for Jönköping Airport (ESGJ / JKG) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.
ESGJ Airport Charts & Approach Plates
Official charts for Jönköping Airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.
Additional Charts 9
- ESGJ ES-AD 2 ESGJ JÖNKÖPING 1 PDF
- ESGJ ES-AD 2 ESGJ JÖNKÖPING 2 PDF
- ESGJ ES-AD 2 ESGJ JÖNKÖPING 3 PDF
- ESGJ ES-AD 2 ESGJ JÖNKÖPING 4 PDF
- ESGJ ES-AD 2 ESGJ JÖNKÖPING 5 PDF
- ESGJ ES-AD 2 ESGJ JÖNKÖPING 6 PDF
- ESGJ ES-AD 2 ESGJ JÖNKÖPING 7 PDF
- ESGJ ES-AD 2 ESGJ JÖNKÖPING 8 PDF
- ESGJ ES-AD 2 ESGJ JÖNKÖPING 9 PDF
Airport Operations
Jönköping Airport operates with variable hours (see SUP/NOTAM) and requires PPR outside tower hours and for commercial traffic/aircraft over 4000kg MTOM. IFR/VFR traffic permitted up to runway reference code 4E with increased charges outside operating hours.
Fuel & Services
- Fuel Available
- Yes
- Fuel Types
- AVGAS 100LL JET-A1
- Fuel Hours
- As AD operating hours
- Operating Hours
- Ref AIP SUP/NOTAM
- Customs
- Available (O/R Customs TEL +46 31 63 38 00, Immigration TEL +46 10 569 42 37)
100LL: 20,000l, Jet A1: 40,000l fuel truck/150,000l stationary. For payment of fuel AIR BP, VISA, Mastercard and American Express accepted.
Parking & Handling
- GA Parking
- Available
- Details
- Apron ASPH PCN 55/F/B/X/T
- Landing Fees
- Increased charges outside AD operating hours
PPL / GA Operations
PPR required outside TWR hours and for aircraft exceeding MTOM 4000 kg - contact groundhandling@jonkopingairport.se or +46 36 31 12 11. RWY 11/29 closed between Oct 1 - Apr 30. Extended operational hours occur frequently.
Source: AIP data extracted Apr 6, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
1 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
⚠ Registration RequiredOfficial AIP for Sweden via EUROCONTROL EAD (Free with registration)
Managed by: EUROCONTROL EAD
Regional System: EUROCONTROL EAD
Access Information:
Free with registration
Access details: Via EUROCONTROL EAD
Alternative Resources:
Frequently Asked Questions
How many charts are available for ESGJ (JKG) Jönköping Airport?
We list 9 official charts for ESGJ, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.
Where can I find instrument approach plates for ESGJ?
All instrument approach procedures (IAP) for ESGJ (JKG) Jönköping Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for ESGJ free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.