KBEC (BEC) Beech Factory Airport — Charts, Approach Plates & Operations
4 official charts for Beech Factory Airport (KBEC / BEC) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.
KBEC Airport Charts & Approach Plates
Official charts for Beech Factory Airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.
Airport Diagrams 1
Instrument Approach Procedures (IAP) 2
Takeoff Minimums 1
Airport Operations
KBEC is a factory airport with tower operations Mon-Fri 0700-1730, no fuel available, and PPR required for parking. Aircraft must maintain 2200 ft MSL within 5 miles due to AFB traffic. Wildlife hazards including deer, coyote and migratory waterfowl on and in vicinity of airport.
Fuel & Services
- Fuel Available
- No
- Operating Hours
- 0700-1730 MON-FRI
NONE
Parking & Handling
- GA Parking
- Available
- Details
- PRKG UNAVBL EXC 4 HRS PPR CALL 316-515-7140. PPR FOR PARKING OR TAXIING WEST SIDE OF RY
- Landing Fees
- No
Published Approach Procedures
Special Procedures
ARR & DEP ACFT MAINTAIN 2200 FT MSL WITHIN 5 MILES OF FIELD DUE TO AFB TRAFFIC. ARRS FROM THE W CROSS MIDFIELD ENTER DNWND
PPL / GA Operations
RWY 19 calm wind runway. Right traffic pattern RWY 01, left traffic pattern RWY 19. BE ALERT COL JAMES JABARA ARPT 3 miles north 1/2 mile west of arpt. DEER, COYOTE & MIGRATORY WATER FOWL ON & INVOF ARPT. EXTENSIVE TRAINING ACTIVITIES RWY 19
Source: AIP data extracted Jun 14, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
6 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
✓ Free Access
Access Information:
Freely accessible online
Access details: Public
Frequently Asked Questions
How many charts are available for KBEC (BEC) Beech Factory Airport?
We list 4 official charts for KBEC, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.
Where can I find instrument approach plates for KBEC?
All instrument approach procedures (IAP) for KBEC (BEC) Beech Factory Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for KBEC free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.