Qaarsut Airport

BGUQ / JQA

Uummannaq, GL

BGUQ (JQA) Qaarsut Airport — Charts, Approach Plates & Operations

11 official charts for Qaarsut Airport (BGUQ / JQA) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.

BGUQ Airport Charts & Approach Plates

Official charts for Qaarsut Airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.

Airport Diagrams 1

All charts sourced from official AIP publication. Last updated: April 15, 2026. Always verify with the official AIP before flight.

Airport Operations

Qaarsut Airport operates MON-FRI with PPR required and customs by arrangement. The airport has gravel surfaces and provides Jet A1 fuel with 400 L/min capacity. Special PPR 3 hours required for aircraft over 10 tons except scheduled traffic.

Fuel & Services

Fuel Available
Yes
Fuel Types
JET-A1
Fuel Hours
As AD
Operating Hours
MON-FRI 1100-1800 (1000-1700)* UTC EXC SAT/SUN/HOL
Customs
Available (By arrangement)

400 L/MIN capacity

Parking & Handling

Details
Apron surface: Gravel, depending on meteorological conditions
PPR Required

Special Procedures

PPR 3 HR before landing or departure for all traffic above 10 tons and more than 19 passengers except for scheduled traffic

PPL / GA Operations

Gravel runway 15/33, taxiway width 15M gravel surface depending on meteorological conditions. All obstacles marked day and night. Runway and taxiway lights used as day marking. De-icing facilities not available.

Source: AIP data extracted Apr 15, 2026. Always verify with official AIP before flight. View source

Radio Frequencies

No Frequencies Available

Radio frequency data is not available for this airport.

For current frequencies, please refer to:

  • • Official airport charts
  • • AIP publications
  • • Flight information service
Data Source: Frequencies are sourced from OurAirports.com, updated daily. Always verify current frequencies using official airport charts, AIP publications, or contact the airport directly. Frequencies may change due to operational requirements or regulatory updates.

Aeronautical Information Publication (AIP)

Free Access
ICAO Aeronautical Information

General ICAO aeronautical information

Managed by: ICAO

Access Information: Freely accessible online

Alternative Resources:

Frequently Asked Questions

How many charts are available for BGUQ (JQA) Qaarsut Airport?

We list 11 official charts for BGUQ, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.

Where can I find instrument approach plates for BGUQ?

All instrument approach procedures (IAP) for BGUQ (JQA) Qaarsut Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.

Are the charts for BGUQ free?

Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.

How often are charts updated?

Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.