ESKN (NYO) Stockholm Skavsta Airport — Charts, Approach Plates & Operations
9 official charts for Stockholm Skavsta Airport (ESKN / NYO) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.
ESKN Airport Charts & Approach Plates
Official charts for Stockholm Skavsta Airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.
Additional Charts 9
- ESKN ES-AD 2 ESKN STOCKHOLM-SKAVSTA 1 PDF
- ESKN ES-AD 2 ESKN STOCKHOLM-SKAVSTA 2 PDF
- ESKN ES-AD 2 ESKN STOCKHOLM-SKAVSTA 3 PDF
- ESKN ES-AD 2 ESKN STOCKHOLM-SKAVSTA 4 PDF
- ESKN ES-AD 2 ESKN STOCKHOLM-SKAVSTA 5 PDF
- ESKN ES-AD 2 ESKN STOCKHOLM-SKAVSTA 6 PDF
- ESKN ES-AD 2 ESKN STOCKHOLM-SKAVSTA 7 PDF
- ESKN ES-AD 2 ESKN STOCKHOLM-SKAVSTA 8 PDF
- ESKN ES-AD 2 ESKN STOCKHOLM-SKAVSTA 9 PDF
Airport Operations
ESKN operates H24 with IFR/VFR traffic permitted. Main runway 08/26 is 9442ft with code 4E capability (code F available), secondary runway 16/34 is 6690ft code 3C. Airport elevation 142ft with magnetic variation 6°E.
Fuel & Services
- Fuel Available
- Yes
- Fuel Types
- 100LL Jet A1
- Fuel Hours
- H24, AVBL 1 HR PN 2100-0600 (2000-0500)
- Operating Hours
- H24
- Customs
- Available (Custom H24, Immigration 0500-2100 (0400-2000) Other hours O/R)
Fuel supplier YMFAS/Air BP TEL +46 733 54 04 41
Parking & Handling
- GA Parking
- Available
- Details
- Multiple aprons available - Apron 1 PCN 40/F/B/X/T, Apron 2 PCN 60/F/B/X/T, Apron 4 PCN 20/F/C/Y/T, Apron 5 PCN 20/F/C/X/T
- Landing Fees
- Charges and Conditions, see www.skavsta.se
- Parking Fees
- Charges and Conditions, see www.skavsta.se
PPL / GA Operations
Fuel available H24 with 1 hour prior notice required 2100-0600. Limited hangar space and repair facilities available for light aircraft/helicopters. De-icing available H24 with prior notice during night hours. Fire fighting CAT 7 standard, higher categories on request.
Source: AIP data extracted Apr 6, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
3 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
⚠ Registration RequiredOfficial AIP for Sweden via EUROCONTROL EAD (Free with registration)
Managed by: EUROCONTROL EAD
Regional System: EUROCONTROL EAD
Access Information:
Free with registration
Access details: Via EUROCONTROL EAD
Alternative Resources:
Frequently Asked Questions
How many charts are available for ESKN (NYO) Stockholm Skavsta Airport?
We list 9 official charts for ESKN, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.
Where can I find instrument approach plates for ESKN?
All instrument approach procedures (IAP) for ESKN (NYO) Stockholm Skavsta Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for ESKN free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.