RCKW (HCN) Hengchun Airport — Charts, Approach Plates & Operations
3 official charts for Hengchun Airport (RCKW / HCN) — airport diagrams, instrument approach procedures, SIDs, STARs, and operational information for pilots.
RCKW Airport Charts & Approach Plates
Official charts for Hengchun Airport published by the national aviation authority. Updated every 28 days per AIRAC cycle. All links open the official PDF source in a new tab.
Obstacle Charts 1
Additional Charts 2
Airport Operations
Hengchun Airport operates VFR only from 0100-0900 UTC with prior notice required for handling services. No fuel services available and limited facilities - aircraft operators must prepare their own cargo handling equipment.
Fuel & Services
- Fuel Available
- No
- Operating Hours
- 0100-0900 UTC
NIL - No fuelling services available
Parking & Handling
- GA Parking
- Available
- Details
- 6 aircraft stands available including 2 helicopter positions (stands 4 and 5). Apron surface: concrete, strength PCR 180/R/B/W/U
Special Procedures
VFR traffic only permitted. Refer to RCKW AD 2.20 Local Aerodrome Regulations for airport available hours
PPL / GA Operations
VFR operations only. Airport has Category 5 fire fighting capability. Multiple obstacles in approach/takeoff areas including electric towers up to 602FT and various buildings. Altimeter checkpoint available at apron (elevation 42FT). Taxies and buses available for ground transportation to Hengchun Township.
Source: AIP data extracted Apr 6, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
2 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
✓ Free AccessAccess Information: Freely accessible online
Frequently Asked Questions
How many charts are available for RCKW (HCN) Hengchun Airport?
We list 3 official charts for RCKW, including airport diagrams, instrument approach procedures (IAP), SIDs, STARs, and visual approaches sourced directly from the official AIP.
Where can I find instrument approach plates for RCKW?
All instrument approach procedures (IAP) for RCKW (HCN) Hengchun Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for RCKW free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.