ZSSS (SHA) Shanghai Hongqiao International Airport — Charts, Approach Plates & Operations
Airport charts, approach plates, and operational data for Shanghai Hongqiao International Airport (ZSSS) directly from the official Aeronautical Information Publication.
Airport Operations
Shanghai Hongqiao International Airport operates two parallel runways 18L/36R and 18R/36L with multiple approach frequencies available. Both runways have displaced thresholds and the airport is open to public use at 10 feet MSL elevation.
Fuel & Services
- Fuel Available
- Yes
Parking & Handling
PPL / GA Operations
Runway 18L/36R has 328 feet displaced threshold on both ends, while 18R/36L has 984 feet displaced threshold on both ends. Multiple ground control and apron frequencies available for taxi operations.
Source: AIP data extracted Apr 9, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
8 frequenciesUsage Instructions:
Aeronautical Information Publication (AIP)
⛔ RestrictedOfficial AIP for China
Access Information:
Restricted access or contact required
Alternative URL: https://www.aischina.com/; Access details: Restricted, registration may be required
Frequently Asked Questions
How many charts are available for ZSSS (SHA) Shanghai Hongqiao International Airport?
Official charts for ZSSS are published in the national Aeronautical Information Publication (AIP). Chart data for this airport is being added to our database.
Where can I find instrument approach plates for ZSSS?
All instrument approach procedures (IAP) for ZSSS (SHA) Shanghai Hongqiao International Airport are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for ZSSS free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.